Lifting & Plant RAMS templates
Lifting and plant RAMS are judged on exclusion and competence: keeping people out of the danger zone and proving the operator and lift are planned. Crane lifts in particular need a lift plan and an appointed person.
What principal contractors check in a lifting & plant RAMS
- A lift plan with an appointed person for crane operations
- Operator tickets (CPCS/NPORS) and a banksman where visibility is limited
- Exclusion zones segregating plant from pedestrians
- Ground conditions, outrigger loads and overhead/underground hazards assessed
7 templates
Lifting & Plant risk assessment & method statement templates
Pick the task closest to your job, then make it site-specific — add the site, sequence, access, permits and competence before submission.
Lifting & PlantIn the builder
Crane Lifting Operations RAMS
Lifting · Crane lifting operations
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Lifting & PlantIn the builder
Telehandler Operation RAMS
Plant · Telehandler
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Lifting & PlantIn the builder
360 Excavator Operation RAMS
Plant · Excavator operation
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Lifting & PlantIn the builder
Site Dumper Operation RAMS
Plant · Dumper
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Lifting & PlantIn the builder
Site Traffic Management RAMS
Site · Traffic management
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Lifting & PlantIn the builder
Manual Handling RAMS
General · Manual handling
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Lifting & PlantIn the builder
Forklift (FLT) Operation RAMS
Plant · Forklift (FLT) operation
Plant / liftingExclusion zoneCompetence
Build this RAMS→
Get your lifting & plant RAMS done faster
Build a site-specific RAMS draft free during early access — no card or signup required.