Demolition & Strip-out RAMS templates
Demolition and strip-out RAMS are read against the asbestos survey first. Reviewers check that the survey has been seen, structural stability has been assessed, and there's a stop-work procedure if suspect materials turn up.
What principal contractors check in a demolition & strip-out RAMS
- The asbestos survey reviewed before any strip-out, with a stop-and-report procedure
- Structural stability assessed before removing any load-bearing element
- Exclusion zones and protection for people below or nearby
- A waste segregation and disposal route
Demolition & Strip-out risk assessment & method statement templates
Pick the task closest to your job, then make it site-specific — add the site, sequence, access, permits and competence before submission.
Soft Strip-out RAMS
Demolition · Soft strip
Structural Demolition RAMS
Demolition · Structural demolition
Asbestos Awareness RAMS (non-licensed)
Demolition · Asbestos awareness
Fence & Gate Removal RAMS
Fencing · Fence & gate removal
Mechanical Soft Strip RAMS
Demolition · Mechanical soft strip
Partition & Stud Wall Removal RAMS
Demolition · Partition & stud wall removal
Suspended Ceiling Removal RAMS
Demolition · Suspended ceiling removal
M&E Strip-out RAMS
Demolition · M&E strip-out
Breaking Out Brickwork RAMS
Bricklaying · Breaking out brickwork
Asbestos Risk Assessment
Asbestos · Asbestos risk assessment
Non-Licensed Asbestos Removal RAMS
Asbestos · Non-licensed asbestos removal
Asbestos Sampling RAMS
Asbestos · Asbestos sampling
Asbestos Encapsulation RAMS
Asbestos · Asbestos encapsulation
Asbestos Waste Disposal RAMS
Asbestos · Asbestos waste disposal