Free RAMS templates for UK trades
Search 176 RAMS starting points, pick the closest task, then add your site details and evidence before submission.
- Task and trade search
- 11 work categories
- Builder links for live reports
- Permit, COSHH and competence prompts
- Free during early access
RAMS template
Scaffold Erection & Dismantling RAMS
RAMS template
Electrical Installation RAMS
RAMS template
Excavation RAMS
Working at Height Method Statement & Risk Assessment
General · Working at height
Mobile Tower Scaffold (PASMA) RAMS
Access · Mobile tower scaffold
MEWP / Cherry Picker RAMS
Access · MEWP / cherry picker
Ladder & Stepladder Use RAMS
Access · Ladders & stepladders
Scaffold Erection & Dismantling RAMS
Scaffolding · Scaffold erection
Pitched Roof Work RAMS
Roofing · Pitched roof work
Fragile Roof Work RAMS
Roofing · Fragile roof / rooflights
Gutter Cleaning at Height RAMS
Maintenance · Gutter cleaning
Fall Arrest & Harness Use RAMS (with rescue plan)
Access · Fall arrest / harness
Edge Protection Installation RAMS
Scaffolding · Edge protection
Electrical Installation RAMS
Electrical · Electrical installation
Working Near Live Electrical Services RAMS
Electrical · Working near live services
Temporary Site Electrical Supply RAMS
Electrical · Temporary site electrics
Working Near Overhead Power Lines RAMS
Groundworks · Work near overhead power lines
Excavation RAMS
Groundworks · Excavation
Trenching & Shoring RAMS
Groundworks · Trenching
Confined Space Entry RAMS
Groundworks · Confined space entry
Drainage Installation RAMS
Groundworks · Drainage installation
Working Near Underground Services RAMS
Groundworks · Underground services
Crane Lifting Operations RAMS
Lifting · Crane lifting operations
Telehandler Operation RAMS
Plant · Telehandler
360 Excavator Operation RAMS
Plant · Excavator operation
Site Dumper Operation RAMS
Plant · Dumper
Site Traffic Management RAMS
Site · Traffic management
Manual Handling RAMS
General · Manual handling
Welding Hot Works RAMS
Mechanical · Welding
Cutting & Grinding RAMS
General · Cutting & grinding
Torch-on Felt Roofing RAMS
Roofing · Torch-on roofing
COSHH Assessment RAMS
General · COSHH assessment
COSHH Risk Assessment
General · COSHH risk assessment
Silica Dust (RCS) RAMS
General · Silica dust
Cement & Wet Concrete RAMS
Groundworks · Cement & concrete
Solvents & Paints COSHH RAMS
Finishing · Solvents & paints
Lead Paint Work RAMS
Finishing · Lead paint
Soft Strip-out RAMS
Demolition · Soft strip
Structural Demolition RAMS
Demolition · Structural demolition
Asbestos Awareness RAMS (non-licensed)
Demolition · Asbestos awareness
Bricklaying & Blockwork RAMS
Bricklaying · Bricklaying & blockwork
Steel Fixing RAMS
Groundworks · Steel fixing
Formwork & Shuttering RAMS
Groundworks · Formwork
Concrete Pour RAMS
Groundworks · Concreting
Carpentry & Joinery RAMS
Carpentry · Carpentry & joinery
Plastering RAMS
Plastering · Plastering
Painting & Decorating RAMS
Decorating · Painting & decorating
Floor Laying RAMS
Flooring · Floor laying
Tiling RAMS
Tiling · Wall & floor tiling
Gas & Heating Installation RAMS
Gas · Gas & heating works
Plumbing Installation RAMS
Plumbing · Plumbing installation
Fire Alarm Installation RAMS
Fire systems · Fire alarm installation
Fire Sprinkler System Installation RAMS
Fire systems · Sprinkler installation
Fire Stopping & Passive Fire Protection RAMS
Fire systems · Fire stopping
Solar Panel (PV) Installation RAMS
Electrical · Solar PV installation
CCTV & Security System Installation RAMS
Electrical · CCTV / security install
Data & Structured Cabling RAMS
Electrical · Structured cabling
Suspended Ceiling Installation RAMS
Ceilings · Suspended ceilings
Drylining & Tape Jointing RAMS
Drylining · Drylining & tape jointing
Glazing & Curtain Walling RAMS
Glazing · Glazing / curtain walling
Floor Screeding RAMS
Flooring · Floor screeding
Site Setup & Welfare RAMS
Site · Site setup & welfare
Working in Occupied Premises RAMS
Site · Work in occupied premises
Lone Working RAMS
General · Lone working
Noise & Hand-Arm Vibration RAMS
General · Noise & vibration (HAVS)
Temporary Works RAMS
Site · Temporary works
Fencing Installation RAMS
Fencing · Fencing installation
Fence Post Setting & Concreting RAMS
Fencing · Fence post setting & concreting
Palisade & Security Fencing RAMS
Fencing · Palisade & security fencing
Fence & Gate Removal RAMS
Fencing · Fence & gate removal
Roadside & Highway Fencing RAMS
Fencing · Roadside & highway fencing
Air Conditioning Installation RAMS
HVAC · Air conditioning (split system) installation
Refrigerant Pipework & Brazing RAMS
HVAC · Refrigerant pipework & brazing
F-Gas Handling RAMS (Charging, Recovery & Leak Testing)
HVAC · F-gas charging, recovery & leak testing
Ductwork & AHU Installation RAMS
HVAC · Ductwork & AHU installation
Rooftop Condenser Lifting & Commissioning RAMS
HVAC · Rooftop condenser lifting & commissioning
Builders Clean (Sparkle Clean) RAMS
Cleaning · Builders / sparkle clean
Commercial & Office Cleaning RAMS
Cleaning · Commercial & office cleaning
External Window Cleaning RAMS
Cleaning · External window cleaning
High-Level Cleaning RAMS
Cleaning · High-level cleaning
Pressure & Jet Washing RAMS
Cleaning · Pressure / jet washing
Tree Surgery & Pruning RAMS
Landscaping & Tree Surgery · Tree surgery & pruning
Tree Felling & Dismantling RAMS
Landscaping & Tree Surgery · Tree felling & dismantling
Soft Landscaping & Planting RAMS
Landscaping & Tree Surgery · Soft landscaping & planting
Wood Chipper & Stump Grinding RAMS
Landscaping & Tree Surgery · Wood chipper & stump grinding
Hard Landscaping RAMS
Landscaping & Tree Surgery · Hard landscaping
Pesticide & Weed Control RAMS
Landscaping & Tree Surgery · Pesticide & weed control
Rope Access (IRATA) RAMS
Rope Access · Rope access work positioning
Rope Access Building Inspection RAMS
Rope Access · Rope access inspection
Rope Access Cleaning RAMS
Rope Access · Rope access cleaning
Structural Steel Erection RAMS
Steel Erection · Structural steel erection
Safety Netting Installation RAMS
Steel Erection · Safety netting installation
Metal Decking Installation RAMS
Steel Erection · Metal decking installation
Block Paving & Flag Laying RAMS
Paving & Surfacing · Block paving & flag laying
Tarmac & Asphalt Surfacing RAMS
Paving & Surfacing · Tarmac & asphalt surfacing
Kerbing & Edgings RAMS
Paving & Surfacing · Kerbing & edgings
Pre-cast Concrete Erection RAMS
Pre-cast Concrete · Pre-cast concrete erection
Block & Beam Flooring RAMS
Pre-cast Concrete · Block & beam flooring
Intruder Alarm Installation RAMS
Security Systems · Intruder alarm installation
Access Control Installation RAMS
Security Systems · Access control installation
Roller Shutter & Barrier Installation RAMS
Security Systems · Roller shutter & barrier installation
Window Installation RAMS
Glazing · Window installation
Curtain Walling RAMS
Glazing · Curtain walling
Stone Masonry RAMS
Stone Masonry · Stone masonry & walling
Audio-Visual Installation RAMS
Audio Visual · Audio-visual installation
Signage Installation RAMS
Signage · Signage installation
Locksmith & Door Hardware RAMS
Locksmith · Locksmith & door hardware
Catering Equipment Installation RAMS
Catering · Catering equipment installation
Flat Roof (Single-Ply / EPDM) RAMS
Roofing · Flat roof (single-ply / EPDM)
Roof Cladding & Sheeting RAMS
Roofing · Roof cladding & sheeting
Slate & Tile Re-roof RAMS
Roofing · Slate & tile re-roof
Roof Insulation & Vapour-Control Layer RAMS
Roofing · Roof insulation & VCL
Guttering & Downpipe Installation RAMS
Roofing · Guttering & downpipe installation
Roof Inspection & Survey RAMS
Roofing · Roof inspection & survey
Floor Sanding RAMS
Flooring · Floor sanding
Floor Screed & DPM RAMS
Flooring · Floor screed & DPM
Vinyl & LVT Flooring RAMS
Flooring · Vinyl & LVT flooring
Carpet & Carpet Tile RAMS
Flooring · Carpet & carpet tile
Resin & Epoxy Flooring RAMS
Flooring · Resin & epoxy flooring
Laminate & Engineered Wood Flooring RAMS
Flooring · Laminate & engineered wood
Spray Painting RAMS
Decorating · Spray painting
External Rendering RAMS
Plastering · External rendering
Wallpapering RAMS
Decorating · Wallpapering
Exterior Decorating RAMS
Decorating · Exterior decorating
Tile Removal RAMS
Tiling · Tile removal
Floor Tiling RAMS
Tiling · Floor tiling
Drain Jetting & Cleaning RAMS
Drainage · Drain jetting & cleaning
Drainage CCTV Survey RAMS
Drainage · Drainage CCTV survey
Breaking Out (Concrete & Road) RAMS
Groundworks · Breaking out (concrete & road)
Duct & Cable Installation RAMS
Groundworks · Duct & cable installation
Mechanical Soft Strip RAMS
Demolition · Mechanical soft strip
Partition & Stud Wall Removal RAMS
Demolition · Partition & stud wall removal
Suspended Ceiling Removal RAMS
Demolition · Suspended ceiling removal
M&E Strip-out RAMS
Demolition · M&E strip-out
Fire Door Installation RAMS
Fire Doors · Fire door installation
Fire Door Inspection RAMS
Fire Doors · Fire door inspection
Fire Damper Installation & Inspection RAMS
Fire Doors · Fire damper installation & inspection
Scaffold Loading Bay RAMS
Scaffolding · Loading bay
Staircase Access Tower RAMS
Scaffolding · Staircase access tower
System Scaffold (Kwikstage / Cuplok) RAMS
Scaffolding · System scaffold (Kwikstage/Cuplok)
Scaffold Inspection & Handover RAMS
Scaffolding · Scaffold inspection & handover
First-Fix Carpentry RAMS
Carpentry · First-fix carpentry
Second-Fix Carpentry RAMS
Carpentry · Second-fix carpentry
Kitchen Installation RAMS
Carpentry · Kitchen installation
Staircase Installation RAMS
Carpentry · Staircase installation
Brick Re-pointing & Repair RAMS
Bricklaying · Re-pointing & repair
Breaking Out Brickwork RAMS
Bricklaying · Breaking out brickwork
Foundation Works RAMS
Groundworks · Foundation works
Concrete Slab Pour & Power Float RAMS
Groundworks · Slab pour & power float
Power Flushing RAMS
Plumbing · Power flushing
Heating Controls Installation RAMS
Plumbing · Heating controls
Ductwork Cleaning RAMS
HVAC · Ductwork cleaning
Sprinkler Maintenance & Drain-Down RAMS
Fire systems · Sprinkler maintenance & drain-down
Asbestos Risk Assessment
Asbestos · Asbestos risk assessment
Non-Licensed Asbestos Removal RAMS
Asbestos · Non-licensed asbestos removal
Asbestos Sampling RAMS
Asbestos · Asbestos sampling
Asbestos Encapsulation RAMS
Asbestos · Asbestos encapsulation
Asbestos Waste Disposal RAMS
Asbestos · Asbestos waste disposal
Confined Space Rescue Plan
Rescue Plans · Confined space rescue plan
MEWP Rescue Plan
Rescue Plans · MEWP rescue plan
Work at Height Rescue Plan
Rescue Plans · Work at height rescue plan
Forklift (FLT) Operation RAMS
Plant · Forklift (FLT) operation
Event Risk Assessment
Events · Event risk assessment
Warehouse Risk Assessment
Warehousing · Warehouse risk assessment
Facilities Management & Maintenance RAMS
Facilities Management · FM & reactive maintenance
Office Risk Assessment
Office & Workplace · Office risk assessment
Noise Risk Assessment
General · Noise risk assessment
Care Home Risk Assessment
Care & Healthcare · Care home risk assessment
Commercial Kitchen Risk Assessment
Hospitality & Catering · Commercial kitchen risk assessment
DSE (Display Screen Equipment) Risk Assessment
Office & Workplace · DSE risk assessment
Young Persons Risk Assessment
Workplace H&S · Young persons risk assessment
Construction Risk Assessment
Construction · Construction risk assessment
Slips, Trips & Falls Risk Assessment
Workplace H&S · Slips, trips & falls risk assessment
New & Expectant Mothers Risk Assessment
Workplace H&S · New & expectant mothers risk assessment
Retail Risk Assessment
Retail · Retail risk assessment
Hotel Risk Assessment
Hospitality & Catering · Hotel risk assessment
Farm Risk Assessment
Agriculture · Farm risk assessment
Consumer Unit Replacement RAMS
Electrical · Consumer unit replacement
Boiler Installation RAMS
Plumbing & Heating · Boiler installation
Make your template site-specific before submission
Every template gives you the structure and controls a reviewer expects. Before submission, replace the generic wording with the actual site, sequence, access, interfaces, permits, COSHH/SDS, competence and emergency arrangements.
Site-specific
Actual site, work area, access, interfaces, site rules, public or occupants and emergency arrangements.
Evidence-ready
Permits, COSHH/SDS, competence, inspections, isolation records, briefings, sign-off and revision control.
Usable on site
A numbered method, risk ratings and controls a supervisor can brief before work starts.
Competent review
RamsDocs drafts the document; the competent person checks, revises and approves it before use.
Built around CDM 2015, HSE construction guidance and RamsDocs reviewed task knowledge. No guarantee of acceptance: each RAMS still needs competent review against the live site.